• During the realization and final installation of a new ride, CHC will not only dispatch skilled mechanical and electrical engineers to customer park site to guide the installation work, but also train the local operators and the park maintenance department.
• All of installed rides must be open to the public after rigorous testing and operation.
• On daily operation, each ride needs to have a set of operating rules, and operators must strictly enforce to ensure the safety.
No.77, Fuxing Road, Baoding City,
Hebei Province, China 071000
Tel/WhatsApp: +86 139 3126 3054
E-mail:info@chcrides.com